Tuesday, October 25, 2011

Days 41 and 42


Nothing happened in the basement yesterday.  Upstairs the kitchen tile got started but I forgot to take a picture.



Today the plumber came back and finished installing the wet bar faucet.



He got the Water Closet sink mounted on the wall but still needs some kind of part to finish it.  You can see there isn't really any room for soap on the sink itself, which is why we did the niche in the wall.



He got the black strainer baskets installed.  We had chrome ones in there so I could use it until the black ones came in.  He still didn't caulk around the edge though, not sure why not.



There was a lot of tiling done in the kitchen today!  Yesterday he got all the way around the counter, today was the back wall.  I feel so bad, there are only 2 pieces of tile on that entire wall that didn't have to be cut.  Every single cut requires a trip up and down the stairs to the wet saw outside.  It is very labor intensive.


Here's a closer picture of that new inset that will be above the stove.