Saturday, October 8, 2011

Day 30


The rest of the kitchen cabinets got set today.  The shelves for the back wall are sitting there on the floor.



Apparently I forgot to take a Before picture of this, but there was a step down from the main house at the doorway, then another step back up partway into the laundry room.  It was a stupid design and everyone tripped.  The floor is now built up, and there is a step where it makes more sense.  I don't feel like unloading the entire laundry room, because its a pretty big storage area which is full right now.  Finishing the floor in there will have to wait  until the current project is done.



The countertops are done for the wet bar and the master bath.



The tile went in in both downstairs bathrooms.  It was dark and rainy when I was taking pictures, so better ones will have to come later.

No comments:

Post a Comment