Friday, October 21, 2011

Days 39 and 40


On day 39 not a lot of visible stuff happened.  The wet bar sink was set in place, and the painter continued working on the trim.



Some very visible stuff happened on Day 40.  The shower door was installed.  I *love* the oil-rubbed bronze finish!  Its a good thing, because it costs a lot more than chrome or gold-toned.

We also had a door installed in the upstairs bath, where there had been a curtain before.  But, there is also a Jacuzzi tub upstairs, with tightly curved sides, so curved that the shower curtain doesn't even come  close to the wall, so a lot of water leaks out, even when I'm taking a shower, and its not the kids being sloppy.  That water had been leaking on down into the basement, which the former owner was apparently fine with, but I am not.



We got carpet today!



Carpet in the master closet.



Carpet on the stairs is *so* much easier for our elderly dog.



Got the glass in the mirror for the master bath.