Tuesday, September 6, 2011

Day 7


Got the powder bath and mechanical room framed out, and the pocket door frame for the powder bath.  The bummer is those furnace silver furnace vents up there can't move, and are above the toilet in the powder bath, so they'll get have to get framed around and hidden behind a drywall bumpout.



The pocket door in the master closet.



This door is coming out completely, and widened to that next stud to the left.  Its a load-bearing wall though, so the engineer came out today to figure out what we've got to do above the doorway.

Oh, and also figured out today that the floor slopes over 2 inches from one side to the other, mostly on one half.  I forgot to take a picture of that though.  This is an issue since we want to put laminate flooring in down here.  We'll see what the flooring guy says about it.