Saturday, September 17, 2011

Day 15

The plumbers came today, even though its Saturday.  I think we're having an inspection on Monday, and stuff had to be done.


The master bathroom sink is ready.



And the shower got set today.  The stupid concrete slab slopes 3/4 of an inch along the length of the shower, so they had to pour 80 pounds of concrete under there to level it out.



This is the doorway that got framed yesterday.  It will be SO much nicer not to look in the messy coat room.

No comments:

Post a Comment