Day 5


Now that the concrete is dry, the framing can start.  The closest wood on the floor will be this end of the master bedroom.  I'm standing in what will be the new TV room.  That ladder is in my bedroom.



The bit that runs out of the picture is the mechanical room, the little bit above that is the powder bath, then the master bath, then the master closet.



This will be the closet in the office/sewing room.



My bed will go on this wall, that sewing room closet will be on the other side of it.



A more distant shot of the sewing room closet, the bedroom, and the TV room.



This is the least exciting sounding part, but I'm ecstatic to have a mechanical room.  That water heater will move to the right, beside the furnace.  The existing furnace is 28 years old, so it's time for a new one of those too.  NOT seeing that stuff makes me very happy.



And here is one of the most important things so far, the Port-A-Potty was delivered today!!  Now we technically have more than 1 bathroom again.  At least this one has walls.