Wednesday, November 2, 2011

Day 44

I didn't think anyone was going to come on Monday, but the tile guy showed up, which was great because I really needed to talk to him about the kitchen.


He got both of the downstairs backsplashes set and ready for grout.



Upstairs we needed to talk about how to finish off the inside of the window frames.  We did these little triangles so we could get the bullnose finish on both the top and front sides.  Now the kitchen is also ready for grout.

No comments:

Post a Comment