Wednesday, August 31, 2011

Days 2 and 3


New underground plumbing installed for the master bath and powder bath.  That end closest to the bottom of the picture is floor drain for the water heater.  It will be in the mechanical room now instead of stuck out in the middle of the floor.




This is the drain pipe for the kitchen and upstairs bathroom.  It had been several inches out from the wall.  Now it will be hidden in the wall like it should be.



Here's the trash dumpster, a load of 2x4s for the framing that will start Friday, and a pallet of concrete.  