Thursday, September 8, 2011

Day 8


The biggest thing that happened downstairs today was framing the soffitt to hide the ductwork and main support beam.



So here is the temporary kitchen area.



And the temporary dining area.



And the last photo of the hideous kitchen still intact.

Tuesday, September 6, 2011

Day 7


Got the powder bath and mechanical room framed out, and the pocket door frame for the powder bath.  The bummer is those furnace silver furnace vents up there can't move, and are above the toilet in the powder bath, so they'll get have to get framed around and hidden behind a drywall bumpout.



The pocket door in the master closet.



This door is coming out completely, and widened to that next stud to the left.  Its a load-bearing wall though, so the engineer came out today to figure out what we've got to do above the doorway.

Oh, and also figured out today that the floor slopes over 2 inches from one side to the other, mostly on one half.  I forgot to take a picture of that though.  This is an issue since we want to put laminate flooring in down here.  We'll see what the flooring guy says about it.

Monday, September 5, 2011

Day 6


I thought Labor Day was for doing no labor, but John disagreed.  Now we have another bedroom wall.



Master bath and master closet are framed in.



And Sophie has given her approval.

Friday, September 2, 2011

Day 5


Now that the concrete is dry, the framing can start.  The closest wood on the floor will be this end of the master bedroom.  I'm standing in what will be the new TV room.  That ladder is in my bedroom.



The bit that runs out of the picture is the mechanical room, the little bit above that is the powder bath, then the master bath, then the master closet.



This will be the closet in the office/sewing room.



My bed will go on this wall, that sewing room closet will be on the other side of it.



A more distant shot of the sewing room closet, the bedroom, and the TV room.



This is the least exciting sounding part, but I'm ecstatic to have a mechanical room.  That water heater will move to the right, beside the furnace.  The existing furnace is 28 years old, so it's time for a new one of those too.  NOT seeing that stuff makes me very happy.



And here is one of the most important things so far, the Port-A-Potty was delivered today!!  Now we technically have more than 1 bathroom again.  At least this one has walls.


Day 4




After waiting a good bit of the morning for the county inspector to come sign off on the underground portion of the plumbing, (we passed, YAY!) John and Ron started pouring the concrete to fill in the holes.  This has got to be the hardest way to mix concrete.  The job isn't big enough to warrant a real mixer, so they had to do it by hand in the wheelbarrow.  It looked so easy from behind the camera, lol.




After pouring it in, they had to level it out and make it all pretty.  4 different holes.  This took the rest of Day 4.

Wednesday, August 31, 2011

Days 2 and 3


New underground plumbing installed for the master bath and powder bath.  That end closest to the bottom of the picture is floor drain for the water heater.  It will be in the mechanical room now instead of stuck out in the middle of the floor.




This is the drain pipe for the kitchen and upstairs bathroom.  It had been several inches out from the wall.  Now it will be hidden in the wall like it should be.



Here's the trash dumpster, a load of 2x4s for the framing that will start Friday, and a pallet of concrete.  

Monday, August 29, 2011

Day 1


It looks so much better already, just getting that nasty carpet out of there.



We have to move a bunch of plumbing, which requires big holes in the floor.  John is starting to cut the concrete.  They let me run the saw too, great fun!  I tried the sledgehammer too but after 3 swings I decided to stick to power tools, lol.



Starting to break out the chunks.  I helped a little with this too because it was more fun than the work I was actually supposed to be doing.



Here is the biggest hole.  There are 3 smaller ones around the room too.  I was tired just from the little bit I did, and these guys did it for hours on end.  Either they are Men of Steel or I'm a big baby.   I'm gonna go with mostly big baby, lol.